Austin Bluffs Parkway Corridor

Matrix is providing transportation project management and design services for the $30 Million Austin Bluffs Parkway Corridor

The corridor program consists of widening three four lane segments to complete a six lane arterial condition along the Parkway. The project will also incorporate bicycle lane, pedestrian, access, signalization, utility and stormwater improvements into the overall corridor consistent with the "Complete Street" objectives set forth by the City.

The design and coordination effort consists of completing a topographic and utility survey of the corridor, a corridor traffic study, a complete stormwater analysis of the roadway drainage facilities, preliminary and final roadway design documents, utility coordination and design documents and a complete construction documentation package. The project design duration will run through 2011 with construction slated for 2012.