Kansas Army Ammunition Plant Water & Wastewater Assessment & Infrastructure Master Plan

As part of the approach to this project, Matrix evaluated the condition of existing infrastructure.

The Matrix team spent two weeks in the field visiting individual infrastructure components, evaluating their existing condition and preparing an existing condition assessment for each component. After establishing the condition of the existing infrastructure, Matrix evaluated the build out need for water and wastewater systems and prepared an infrastructure master plan. The master plan included the results of the hydraulic model and sanitary sewer capacity model which provided demand requirements, water rights analysis, storage requirements, distribution line sizing, water treatment requirements, sanitary sewer demands, collection system line sizing, lift station requirements, force main sizing, wastewater treatment requirements, and industrial wastewater treatment requirements.

This includes potable water distribution systems, potable water storage tanks, potable water treatment, sanitary sewer collection systems, sanitary sewer lift stations, septic systems, sanitary sewer treatment, and industrial treatment facilities.